Project Highlight At a prominent confectionery site in York, Newsome has installed a high-capacity 400 kW chiller, marking the timely realisation of the project. Designed to advance ESG targets, the installation enhances system dependability while minimising overall power consumption and CO₂ levels. https://wearethelist.com/story22831762/high-efficiency-400-kw-chiller-installation-achieves-50-000-yearly-energy-savings-and-200-metric-tonnes-co%E2%82%82-reduction