For multi consumer installation which incorporates professional kind of premises which include Retailers, Showrooms, Garages, Workshops, etcetera. in which provision for connection of extra load could possibly be required, the assumed linked load of each spare/Area/circuit shall even be indicated during the load distribution schedules submitted for DEWA's approval. The http://dewa1881.org/