For many deep pour assignments, it is best to block from the substrate perimeter with A short lived dam, with railings, or with elevated edges, due to the fact this epoxy can movement correct off the surface and onto the space beneath it as a consequence of its lower viscosity. https://mcgepoxycoatings.com/how-an-epoxy-concrete-coating-can-transform-your-floor/