1

High-Efficiency 400 kW Chiller Installation Delivers £50,000 Yearly Energy Savings and 200 Metric Tonnes CO₂ Reduction

News Discuss 
Project Summary Newsome has successfully delivered the installation and commissioning of a modern 400 kW chiller at a well-known confectionery manufacturing site in York. This initiative demonstrates a substantial step forward in the client’s ESG agenda, enhancing operational resilience and achieving measurable reductions in both energy consumption and carbon output. https://newsome.ltd.uk/case-studies/high-efficiency-400-kw-chiller-installation-delivers-50000-annual-energy-savings-and-200-tonnes-co%e2%82%82-reduction/

Comments

    No HTML

    HTML is disabled


Who Upvoted this Story