1

High-Efficiency 400 kW Chiller Installation Achieves £50K Annual Energy Savings and 200 Metric Tonnes CO₂ Saving

News Discuss 
Installation Overview Newsome has successfully finalised the installation and commissioning of a high-performance 400 kW chiller at a major confectionery manufacturing site in York. Designed to advance ESG targets, the installation enhances process efficiency while minimising overall power consumption and CO₂ discharge. https://lingeriebookmark.com/story10680909/energy-efficient-400-kw-chiller-installation-secures-50k-annual-cost-reduction-on-energy-and-200-tonnes-co%E2%82%82-saving

Comments

    No HTML

    HTML is disabled


Who Upvoted this Story